HOA Construction Update – July 31, 2026

Crews focused this week on preparing for second-levelconstruction, along with continued backfilling and structural work throughoutthe Hālau of ʻŌiwi Art site.

Pictured: F&H removed panel braces near the passenger elevator and stairwell area.

CMC installed rebar for Level 2 walls at Retail 1.

Toms Backhoe continued backfilling and compacting behind the loading dock, along the pedestrian walkway next to the Wailuku Parking Garage.

F&H installed scaffolding and decking in preparation for Level 2 construction at Retail 2.