This week’s construction update

Wailuku Parking Structure:
The Hawaiian Dredging and CMC crews commenced with the installation of reinforcing steel and post tensioning cables for the first section of the fourth-floor concrete deck this week. The Hawaiian Dredging crews also poured concrete columns and walls for the second section of the third floor this week.

Maui Kupono crews excavating for parking structure foundation at the Church Street entrance
Lite Electric crews installing streetlight bases at the Market Street entrance to the Parking Structure
CMC crews installing reinforcing steel and post tensioning cables for the fourth-floor concrete deck
Second floor of the parking structure

Vineyard Street Improvements:
The MIRA crews continued with work on the drainage system improvements this week.

Mira crews unloading precast concrete drain structures
Mira crews installing concrete drainage system structures on Vineyard Street
Mira crews installing concrete drain pipe on Vineyard Street

General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm.  

The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway, Wells Park and War Memorial Stadium Parking Lot) and various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, click here.