Wailuku construction update

Wailuku Parking Structure:

The Hawaiian Dredging crews poured the first section of the third floor concrete deck this week.  The Hawaiian Dredging crews also continued with the setting of concrete deck forms for the second section of the third floor concrete deck. 

HDCC crews setting the third floor concrete deck formwork
HDCC crews preparing the third floor concrete deck for the concrete pour
HDCC crews pouring concrete for the first section of the third floor concrete deck

Vineyard Street Improvements: 

The MIRA crews worked on lowering the existing water service laterals to each of the properties this week. 

MIRA crews lowering existing water service laterals on Vineyard Street
MIRA crews pouring concrete sidewalk at the Weinberg Building on Lower Vineyard Street

General Notices:

Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm.  

The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway, Wells Park and War Memorial Stadium Parking Lot) and various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, please visit www.wailukulive.com.